Projects

   

 

Corvallis Courtyard by Marriott – Corvallis, OR 

Corvallis Courtyard by Marriott was a new construction design build that’s approx. 170,000 square feet that includes 176 guest rooms, a bar & restaurant, fitness center, indoor swimming pool and 2,914 square feet of meeting event space.  Mike’s Heating & Air Conditioning completed the full mechanical installation of all HVAC including but not limited to exhaust for the facility, humidity control dehumidification system for the pool area, type 1 kitchen hood system, ventilation for  the laundry department, full ERV room ventilation and a chiller. Seimens Energy Management System was installed for the facility that controls mechanical systems.

 

 

Waverly Assisted Living – Albany, OR 

Waverly Assisted Living was a new construction design build that’s approx. 73,000 square feet and is a 71 bed assisted living & 21 bed memory care community. This community also has a full kitchen and hair salon. Mike’s Heating & Air Conditioning completed the full mechanical design & installation of all HVAC including City Multi VRF units serving all common areas, PTAC units for all guest rooms, type 1 kitchen hood system, ventilation for the laundry department and ventilation for HRV units that serves common areas.

 

 

Boulder Falls Inn –  Lebanon, OR

Boulder Falls Inn was a new construction design build that’s approx. 60,000 square feet with 84 guest rooms, a full bar & restaurant & 12,000 square feet of indoor & outdoor conference space. Mike’s Heating & Air Conditioning completed the full mechanical design & installation of all HVAC including but not limited to Mitsubishi City Multi VRF units serving all of the common areas, high efficiency boilers for domestic water supply, type 1 kitchen hood system, full ERV room ventilation, ventilation for laundry department and 84 guest room PTAC units.

 

   

 

YMCA – Albany, OR

YMCA was a new construction design build that’s approx. 60,000 square feet that includes but not limited to a day care, multi-purpose gym, racket court, two large pool areas (lap pool & fun pool), fitness room & a wellness center. Mike’s Heating & Air Conditioning completed the full mechanical design & installation of all HVAC that includes nine roof top package units, exhaust for the facility, high efficiency condensing boilers for the pools & domestic water and two large capacity humidity control dehumidification systems for each pool area. Seimens Energy Management System was installed for the facility that controls mechanical systems.

 

 

Safe Haven Humane Society – Tangent, OR 

Safe Haven Humane Society was a new construction design build that’s approx. 33,000 square feet that includes an area for small and large canines, a feline area, gift shop, several rooms for training canines & areas to visit the animals for potential adoption. Mike’s Heating & Air Conditioning completed the full mechanical design & installation of all HVAC that included 40 tons of Geothermal units that serve the entire building that connects to a loop field consisting of over 30,000 lineal footage of poly pipe and water heaters for domestic water. Siemens Energy Management System was installed for the facility as well that monitors and controls each Geothermal unit.

 

 

Albany Boys & Girls Club Teen Center – Albany, OR 

ABGC Teen Center was a new construction design build that’s approx. 35,000 square feet that includes but not limited to a multi-purpose gym, Indoor Soccer Field/Spectator Seating, Game Room, Concessions, Activity Room, Tech Room, and Arts/Crafts Room. Mike’s Heating & Air Conditioning completed the full mechanical design & installation of all HVAC including Roof Top Package units, General Exhaust, Large Make Up Air Unit and Exhaust for Large Indoor Soccer Field.